• In light of the widespread use of solar energy systems, there was an urgent need for a team to carry out maintenance work on these systems. A long-term agreement for two years, renewable, was signed between our company and the international organization ACTED.
  • During these two years, we carried out maintenance work on more than 300 solar-powered lighting poles (replacing the lighting device with a new one, replacing the battery, and maintaining the electrical circuit).
  • We also installed no less than 100 new solar-powered electrical poles.
  • In addition, we installed small solar energy systems for some small pump stations.